Underwriters Laboratories Network IR Speed Dome Camera Manual de instalación Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
IR Speed Dome Installation Manual
37
switch off the eighth bit of SW2, it will be unconnected.
Figure 3
4. Problems in the Practical Application
Normally, users adopt star-shape connection method in construction, under this situation, the terminal resistors must be connected
between two farthest devices (as Figure 4, 1# and 15#), but this connection method is not satisfy the requirement of the RS485
industry standard so that it will lead to some problems such as signal reflection, anti-jamming ability decline when the devices are
faraway. At this time, the dome will be uncontrollable, or self-running, etc.
1
2
1
3
1
1. Address DIP Switch
2. Protocol DIP Switch
3.Address and Protocol Settings
Instruction
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40

Comentarios a estos manuales

Sin comentarios