
IR Speed Dome Installation Manual
4. Cover the sealing ring and tie the safety lanyard to the dome.
Note: The sealing ring must be set for the dome’s waterproofing.
Figure. 1.2.9 Cover the sealing ring
Figure. 1.2.10 Tie the safety lanyard
5. Hang the IR speed dome’s hanging hook to the top cover. Then, connect the integrated cable into the appropriate slots by suggestive
identifying information near the slots. The circuit interfaces on the bottom board are shown in figure 1.2.12(the bottom board of IR
speed dome), 1.2.13(the bottom board of network IR speed dome), 1.2.14(the bottom board of network high-definition IR speed
dome).
Comentarios a estos manuales