Underwriters Laboratories Network IR Speed Dome Camera Manual de instalación Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 40
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
IR Speed Dome Installation Manual
11
4. Cover the sealing ring and tie the safety lanyard to the dome.
Note: The sealing ring must be set for the domes waterproofing.
Figure. 1.2.9 Cover the sealing ring
Figure. 1.2.10 Tie the safety lanyard
5. Hang the IR speed dome’s hanging hook to the top cover. Then, connect the integrated cable into the appropriate slots by suggestive
identifying information near the slots. The circuit interfaces on the bottom board are shown in figure 1.2.12(the bottom board of IR
speed dome), 1.2.13(the bottom board of network IR speed dome), 1.2.14(the bottom board of network high-definition IR speed
dome).
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 39 40

Comentarios a estos manuales

Sin comentarios